Energy and infrastructure

Design, adapt and run energy assets the way your best engineers would.

Get started

The decision underneath

Get to a safe outcome faster next time.

Your design tools, historians and procedures stay authoritative. Expert judgement decides which configuration, specification or move is right when the site, the duty or the conditions change.

Locked before. Checked after.

Your approval rules decide who acts. Kalyr keeps the record.

One episode, minute by minute

See each move, from first signal to stable output.

A vibration rise after a duty change, from first signal to back in band.

Process stateDeviation from the normal operating band.+00 MIN+12 MIN+24 MIN+36 MIN+48 MINThe episodeFrom evidence to decision.KnowVibration up. Known: new duty. Unknown: bearing.OptionsReduce load, change speed, or stop and inspect.AskDid the alignment change at the last outage?LockEach option expected and locked.ActSpeed change approved. Your team acts.SettleBack in band. Kept on the record.LearnReason kept. Other options: not taken.What happened, and why, kept on the record

Where it applies

Pick the decision that keeps waking the same people.

Recurring decisions across power equipment, plant engineering and utilities.

Get started

Compound your intelligence.

Bring us the decision that rests on a few senior engineers.

* Required